Crews continue working hard to get camp up and running and operational for when the season starts.

This is only a snapshot of the amount of grass seed we are planting on the beach to reduce dust pollution, there are still several loads more ready for the season!

All the equipment and materials are starting to arrive in camp and will be positioned strategically to increase efficiency throughout the season.

Chu Cho Industries is moving trailers into camp so the isolation bunks are ready to receive people with the safest process.

As part of this year’s WDMP, Chu Cho Industries has purchased a new Haybuster 108C Drill seeder, a Wilmar S-500 fertilizer spreader, and a 10ft Mandako Landroller that CCI is customizing at its shop in Mackenzie. This equipment will be used to spread the custom WDMP grass seed mix and fertilizer during the 2021 season. As part of the 2021 WDMP, Chu Cho Industries plans to seed Middle Creek North, Middle Creek South, Van Somer, and Tsay Keh beaches, in addition to irrigating the two Middle Creek beaches and Tsay Keh beach.

The goal for the grass seeding is to establish a cover crop that will hopefully prevent the wind from being able to pick up sand off of the beach, making it airborne and creating a dust storm. The irrigation equipment will wet the beach to reduce dust, but also to water the grass, helping it better establish on the beaches.



Water Based Operations

Water Based Operations

EARTHWORKS

EARTHWORKS

TRANSPORTATION

TRANSPORTATION

HARVESTING

HARVESTING

CHU CHO INDUSTRIES

WE WORK WITH RESOURCE INDUSTRY COMPANIES OPERATING IN THE TSAY KEH DENE TRADITIONAL TERRITORY PROVIDING CONSTRUCTION, TRANSPORTATION, 
TIMBER HARVESTING AND RELATED SERVICES.

Brushing Operations

Brushing Operations

We continue to work diligently on the roadside brushing project. The main guys working on this operation for the season are Blaine Pierre and Corey Sutherland.

Logging: Winter Season

Logging: Winter Season

During the winter season there are many crucial activities around the territory. One of them is road maintenance. When the snow starts falling, the big machines have to prepare the roads for traffic.

Chu Cho Increasing Logging Production

Chu Cho Increasing Logging Production

In most logging operations the first couple months of the new year are critical for production. For the month of January Chu Cho has made a significant increase in production and looks forward to this trend for 2021.

Productive and Safe Equipment

Productive and Safe Equipment

Chu Cho Industries continues to upgrade operations and fleets to ensure safe and productive equipment. Our most recent addition were two plow trucks and one of them is a sander.

Williston Dust Mitigation Program (W.D.M.P.)

Williston Dust Mitigation Program (W.D.M.P.)

Chu Cho Industries management team recently met with Chief and Council to discuss W.D.M.P 2021. Extensive planning and preparation go into this program every year.

Prince George Office Staff

Prince George Office Staff

The main administration office in Prince George is where all the paper work happens. The office staff keeps growing as Chu Cho Industries continues to grow.

Logging: Winter is coming

Logging: Winter is coming

Chu Cho Industries continues to log in the Isola and Swannell area. Logging operations are starting to wrap things up and get ready to shift south into the Mackenzie area for the winter.

Burning Piles

Burning Piles

Chu Cho Industries has secured multiple burning contracts. The first crew started on the first weekend with more crew to come. Burning is physically demanding, it is an outdoor project requiring a full day of work.

Safety Certification

Safety Certification

Chu Cho Industries was Audited back in August. We just received our results and for the second time in a row the team scored 99%. This is a huge accomplishment and all employees should be proud!

Debris Program Find

Debris Program Find

Currently Chu Cho Industries is working on the Debris Program out of Collins Bay Camp. This is an ongoing treatment that removes debris hazards from the reservoir which helps with boating safety, fish habitat, and clears the beaches for recreational use.

Camp Services

Camp Services

Chu Cho Industries has been involved in running camp services for several clients over the years. Specifically, the Collins Bay Camp. Crews have become extremely reliable and efficient on keeping camps up and running.

Logging Season 2020

Logging Season 2020

Chu Cho Industries has started to organize the 2020 logging season and will continue to ramp up operations in the next couple weeks. Log hauling will be starting from the Swannell area into Flood Creek.

Kemess Drill Rig Support

Kemess Drill Rig Support

Chu Cho Industries is currently supporting Centerra Exploration. Highly experienced operators are responsible for running excavators and dozers in order to allow drill rigs access into the steep mountain terrain.

Debris Program

Debris Program

Chu Cho Industries in collaboration with Chu Cho Environmental did the annual flight around the reservoir to determine debris locations and to come up with an operational work plan.

Williston Dust Mitigation Program (W.D.M.P.)

Williston Dust Mitigation Program (W.D.M.P.)

Chu Cho Industries had a successful season prior to the excessive rain and high water on the reservoir. The water came up extremely fast in the second half of June, pushing crews off the beach.